Quote:
Originally Posted by keakar
cant you put him on straight commission basis only.
pay based on the billable hours only and deductions for warranty work
basicly turn him into a subcontractor doing extra work for you so interactions are very limited between you
its tough man, god bless and I hope the good lord helps keep your blood pressure down because the only way out is to tell him to get out 
|
The whole world should be on commission. It would take care of a lot of problems.