we are building a 4000sqft house in N AR and I am doing the GC, as of right now we are 95% done to having it in the dry. I will have 275K into it, that comes out to 68.75 per ft I am figuring that number to double for a finished house.
Its a log house with a full basement and a second, or third floor if you consider the basement the first floor.
|