View Single Post
  #16  
Old 02-12-2015, 04:06 PM
Gerald Gerald is offline
Sailfish
 
Join Date: May 2009
Location: Lake Charles / Moss Bluff
Posts: 4,648
Cash: 4,232
Default

Feb. 11, 2015 Update

I took a few pictures yesterday. While down by the Dock, I saw a guy move the barricade and drive in??????

A little while later I talked to the man. He said he was the construction project Engineer and we talked about the Park.

He said that the only thing remaining to do was to seal the joints between the concrete slabs and then do the stripping for the parking spots. He was hopping to get this work completed by March 15 [about a month from now].

The other thing I learned is that a good portion of the Park will be to the east side of the boat launch. When this part of the park is built, there will be a road connecting the boat launch area to the other parts of the park.

The "soft" landing for Kayaks has been put in place. There is a short path of sand installed just to the west of the boat launch. This area looked ok to put in a small Kayak, but might be tight for a larger Kayak.

We talked about the "erosion" from water draining off the parking area concrete. He said that they would probably put in some larger rocks or concrete to this area.

Over all this work looks great and will rival the Calcasieu Point boat landing as the nices boat launch in southwest Louisiana.
Attached Images
File Type: jpg IMG_0657.jpg (57.2 KB, 361 views)
File Type: jpg IMG_0659.jpg (67.7 KB, 360 views)
File Type: jpg IMG_0669.jpg (82.0 KB, 359 views)
File Type: jpg IMG_0670.jpg (84.6 KB, 359 views)
File Type: jpg IMG_0667.jpg (115.5 KB, 361 views)
File Type: jpg IMG_0675.jpg (106.1 KB, 362 views)
Reply With Quote