View Single Post
  #6  
Old 02-16-2015, 01:22 PM
capt coonassty's Avatar
capt coonassty capt coonassty is offline
Trophy Trout
 
Join Date: Aug 2010
Location: Baton Rouge
Posts: 468
Cash: 1,338
Default

Quote:
Originally Posted by capt coonassty View Post
Attachment 82849


Sent from my iPhone using Tapatalk
I just wanted to put this out here and bring up this point. Caernarvon diversion was designed to be a fresh water diversion. The main goal was never to build marsh, only reduce salinity and reduce stress and lessen the loss rates. But even though it isn't feeding off of the bottom of the river where the heavier sediments are it still building land. Same thing with the Naomi siphon.

The Diversions planed are going to be designed for sediment transport and will have a better ability to build land in the outfall.
Reply With Quote