the plans you are referring to are just a conceptual design by tetra-tech out of belleview, Wa. that wall you are describing would be 20468 ft long with 2 bypass sills at 60ft wide and 4 channels to enter and exit the lake with possible wiers and of course the boat bay to go with each wier .the other concept is to put a salt water lock at the south and north end of the channel at mile marker 3 and 11 with bypass sills at each one. these are only 2 of the many concepts that the coastal protection and restoration authority have planned out for the future.
|