View Single Post
  #21  
Old 05-08-2017, 08:14 AM
Rjrobin2002 Rjrobin2002 is offline
Flounder
 
Join Date: Dec 2014
Location: Bossier City
Posts: 73
Cash: 585
Default

Got my double floor in, just not rivited down yet. Then built channel amd hinges for front deck lids. It will be dry storage as all the channel will drain water off the front deck to the back. Just lack the final 2 feet of the nose now.
Attached Images
File Type: jpg 20170506_160340.jpg (36.8 KB, 471 views)
File Type: jpg 20170506_165916.jpg (49.6 KB, 472 views)
File Type: jpg 20170506_181159.jpg (49.1 KB, 468 views)
File Type: jpg 20170506_193055.jpg (39.9 KB, 465 views)
File Type: jpg 20170506_193152.jpg (45.1 KB, 468 views)
Reply With Quote