Originally Posted by Gerald View Post
When I took the pic, they were pulling up the "brush" behind the existing rocks. I guess they were going to widen where the rock are placed.


At the weir, the barge had rocks. For the reef, the concrete looked to be a square shape. I post a pic in another post.


The blocks are to anchor down hazard line buoys on the inside of grand bayou.
The work on all three of the weirs is complete. With exception of a couple small buoys to go on the hazard line (vendor screwed up my order).

Cca reef is going in where dls has their crane set up in the middle of the lake.
They are putting down concrete piers to spread out the psi. Then the rock is going in top. I think we are putting the rock on for them.


Sent from my iPhone using Tapatalk