SaltyCajun.com http://www.braggingbadges.com/

Notices

Go Back   SaltyCajun.com > Fishing Talk > The Conservationist's Corner

The Conservationist's Corner For discussion of everything to do with conservation!

Reply
 
Thread Tools Display Modes
  #1  
Old 12-26-2010, 03:34 AM
Ray's Avatar
Ray Ray is offline
Great White
 
Join Date: Jul 2009
Location: House
Posts: 10,432
Cash: 1,217
Default Lower Cameron dredging

The dredging project has been on hold for several days due to unexpectedly high amounts of shell in the Cameron Loop. The contractor
is planning to move the disposal site to the east side of the Cameron Jetties once a permit is received. He will also bring in a larger dredge
if needed. Moving the spoil site will avoid having to pump material under the ship channel, which is 70-80 feet deep near the mouth. The
dredge material will also help repair some of the erosion that has threatened the Jetty Pier Park.
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:48 PM.



Powered by vBulletin®
Copyright ©2000 - [ARG:3 UNDEFINED], Jelsoft Enterprises Ltd.
vB.Sponsors
vBCredits v1.4 Copyright ©2007 - 2008, PixelFX Studios
SaltyCajun.com logo provided by Bryce Risher

All content, images, designs, and logos are Copyright © 2009-2012,
Salty Cajun, LLC
No unathorized use is permitted
Geo Visitors Map