The wire mesh is pulled up when the concrete was poured. I hired some concrete finishers to do the concrete work.
It took 11 1/2 yards. It is 14' X 28' with a 17' driveway. I got the concrete from the guy I posted with the big Squid. $87/yard.
It is just a pole barn type, with a bit attic for my wife to store stuff.
It will be shingled roof with the same vinyl siding as my house so it will look the same.
|