Originally Posted by fishinpox
Rainin it's arse off in br..... Bout to go to the job n see how much dirt washed out of this form that didn't get completed b4 the rain @$&@^*%}}|\#€*+€#
|
I think one of my most pissed off days while building my house was when they got everything formed up and the footings dug but when I went check things out I would only have about 1-2 inches of slab in most places. They had already put the visqueen and screen down so they had to put some "risers" on top of the forms to make the slab thicker since my plan called for minimum 4 inches thick. Well they farted around and 2 days later we got a big rainstorm and it filled up the footings with water. Before I could get out there they dug some big azz trenches to get the water out, I was highly pissed!! I had all my topsoil down already so that's why I now have a clay yard

. I coulda strangled everybody I talked to that day...