Thread: House lifted
View Single Post
  #1  
Old 10-19-2016, 05:37 PM
lancer0827 lancer0827 is offline
Flounder
 
Join Date: Apr 2016
Location: Sulphur
Posts: 73
Cash: 482
Default House lifted

I just had my house lifted 9' off the ground but all the contractor did was lift and crib. I agreed to do the foundation work to save $20,000.00 I can do the foundation work but I am struggling to find any codes as to how wide the footer needs to be and what type of spacing is needed for the block columns. I am planning on a 18" x 18" continuous footer with 16" x 24" block columns. Does any one know the state code requirements for rebar and column spacing?
Reply With Quote