Opens may 26th and June 2nd.
uploadfromtaptalk1399109322308.jpg
Monday, May 26, 6 a.m.*— The portion of state inside waters from the eastern shore of South Pass of the Mississippi River westward to the western shore of Freshwater Bayou Canal, and the portion of state outside waters extending three nautical miles seaward from the shoreline from the Atchafalaya River Ship Channel at Eugene Island as delineated by the Channel red buoy line westward to the to the western shore of Freshwater Bayou Canal at -92 degrees 18 minutes 33 seconds west longitude.
2.* Monday, June 2, 6 a.m.*— The portion of state inside waters from the Mississippi/Louisiana state line westward to the eastern shore of South Pass of the Mississippi River.* However, the open waters of Breton and Chandeleur Sounds as described by the double-rig line are currently open to shrimping.
3.* Monday, June 2, 6 a.m.*— The portion of state inside waters from the western shore of Freshwater Bayou Canal westward to the Louisiana/Texas state line.
In addition to the open waters of Breton and Chandeleur Sounds, all state outside waters are currently open to shrimping except for outside waters extending three nautical miles seaward from the shoreline from the Atchafalaya River Ship Channel at Eugene Island westward to the to the western shore of Freshwater Bayou Canal.
Sent from my SAMSUNG-SGH-I317 using Tapatalk