![]() |
![]() |
![]() |
|
General Discussion (Everything Else) Discuss anything that doesn't belong in any other forums here. |
|
Thread Tools | Display Modes |
#2
|
||||
|
||||
![]()
If the flooding is less than four feet. Take a razor four foot from the floor and cut a straight line in the rock. Start ripping from the bottom when you get close to the cut you made be careful not to mess it up over the line. Sheetrock comes in 4x8 sheets, so it will be easy to just replace it with a whole new sheet.
If the flooding is above 4 feet just rip the whole sheet out. |
Bookmarks |
|
|