SaltyCajun.com http://www.gator-tail.com/

Notices

Go Back   SaltyCajun.com > General Discussion Forums > General Discussion (Everything Else)

General Discussion (Everything Else) Discuss anything that doesn't belong in any other forums here.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 10-19-2016, 05:37 PM
lancer0827 lancer0827 is offline
Flounder
 
Join Date: Apr 2016
Location: Sulphur
Posts: 73
Cash: 532
Default House lifted

I just had my house lifted 9' off the ground but all the contractor did was lift and crib. I agreed to do the foundation work to save $20,000.00 I can do the foundation work but I am struggling to find any codes as to how wide the footer needs to be and what type of spacing is needed for the block columns. I am planning on a 18" x 18" continuous footer with 16" x 24" block columns. Does any one know the state code requirements for rebar and column spacing?
Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:25 PM.



Powered by vBulletin®
Copyright ©2000 - [ARG:3 UNDEFINED], Jelsoft Enterprises Ltd.
vB.Sponsors
vBCredits v1.4 Copyright ©2007 - 2008, PixelFX Studios
SaltyCajun.com logo provided by Bryce Risher

All content, images, designs, and logos are Copyright © 2009-2012,
Salty Cajun, LLC
No unathorized use is permitted
Geo Visitors Map