New blind is in
3 Attachment(s)
We got the new blind built and to the spot.
2 weeks to build it in my Garage, and all day to get it where it needed to be. Unfortunately, the Pond is land locked so we had to carry everything in on your back, and drag a 12' Aluminum Boat loaded with materials. Dimensions are 12'x 5'. Never could have done it without the 2 young'uns help. Camp Podnuh going back this weekend to brush her in. |
Blind looks great!! Hope the water don't come up.
|
water comes up just wear boots or place a secondary elevated platform on the floor to stand on.
|
Blind looks sweet, going build one this weekend...gonna take a good bit of trips but it will be worth it to be where the ducks are
|
Water is as high as I have ever seen it now.
The Boys carried the front and back panels in 250 yards in from where we park the Boat. Rest of the materials we pulled in on a 12 footer Aluminum. |
All times are GMT -5. The time now is 03:36 AM. |
Powered by vBulletin®
Copyright ©2000 - [ARG:3 UNDEFINED], Jelsoft Enterprises Ltd.
vB.Sponsors
All content, images, designs, and logos are Copyright © 2009-2012,
Salty Cajun, LLC
No unathorized use is permitted