If your lot is at elevation 2.5 and the base flood elevation is 11.0 the finished floor or lowest structural member will have to be at least 8.5 feet above natural ground. Go to your Parish building official and obtain a flood elevation certificate based upon the type structure you plan to build or place there. The certificate will have the base flood elevation on it. Then you will have to have a surveyor come out and set a bench mark with an elevation to go off of. See your insurance agent about premiums based upon the height of finished floor or low structural member above the base flood elevation. The surveyor will also have to verify it on the certificate after completion. All stuctures built in flood zones must follow this procedure not just those financed
Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 02:14 PM.



Powered by vBulletin®
Copyright ©2000 - [ARG:3 UNDEFINED], Jelsoft Enterprises Ltd.
vB.Sponsors
vBCredits v1.4 Copyright ©2007 - 2008, PixelFX Studios
SaltyCajun.com logo provided by Bryce Risher

All content, images, designs, and logos are Copyright © 2009-2012,
Salty Cajun, LLC
No unathorized use is permitted
Geo Visitors Map